DV1: Geological and Geoscience risk evaluation

Given the geological and geophysical data, this module provides the necessary input for the design and planning of the well to be in the optimal terms considered.

The result of this risk evaluation offers to the Well Designers and Well Planners the perspective of the construction of the well in terms of geological risk.

To access the DV1 form please click here

DV2: Riskovery Drilling

Together with the data from DV1, the application integrates the concept of drilling project has as primary objective the level of risk, the execution of the borehole in the best conditions – in terms of time, financial and safety of the objective.

To access the DV2 form please click here

DV3: Insurance audit preview

It’s considered as a helpful element in defining the relationship with insurers and the types of insurance to obtain the best price offers.

Risk level LOW

the technical, quality, environmental and safety parameters of the operational process provided, place this project in a very good safety zone (failure rate less than 5%). We consider that it is not mandatory to make an insurance for this project, except for Control of well policy which involves a form of insurance

Risk level MEDIUM

the technical, quality, environmental and safety parameters of the operational process provided, place this project in a good safety zone (maximum failure rate 10%). We consider that a form of insurance is necessary for this project

Risk level HIGH

the technical, quality, environmental and safety parameters of the operational process provided, place this project in an uncertain safety zone (very high failure rate ~ 50%). We consider that an assurance of the project and a revision of its parameters is mandatory

Risk level CRITICAL

the technical, quality, environmental and safety parameters of the operational process provided, place this project in a critical safety zone (the project is not feasible because the failure rate is higher than 50%). We consider that a complete revision of the project is absolutely necessary, because in this form it is neither financeable nor insurable

LOW level report example

MEDIUM level report example

HIGH level report example

CRITICAL level report example

The recommendations brought after the analysis of the data provided, provide an overview of the viability of the project and implicitly a list of objectives that if implemented will bring an improvement both operationally (safety and environmental parameters) and financially (cost optimization implementation and / or insurance)